Grounding & Bonding

Grounding lets breakers trip on a fault. Bonding ties in metal pipes. Older homes often lack one or both.

Signs your panel or wiring needs attention

  • Two-prong outlets around the house
  • No ground rods at the panel
  • Unbonded gas or water pipes
  • A faucet or appliance that tingles

How the job goes, start to finish

  1. Test the existing grounding system
  2. Drive rods, install the grounding electrode conductor
  3. Bond water, gas and CSST (flexible gas line) where required
  4. Confirm it with a ground test

What moves the price

  • Amperage: same as now, 200 amps, or 400 amps
  • Separate meter and main, or a combined unit
  • Utility rules for the mast, meter socket and service entrance
  • How many circuits move or extend to the new panel
  • Grounding, bonding and surge protection up to current code
  • City permit fees, which vary

Permits for panel and wiring work

Panel and service work needs a permit and a city or county inspection. Meter work also needs a utility disconnect, on the utility's schedule and fees. Each fee is listed separately.

Brands we install

SPAN
Square D
Eaton
Siemens
Leviton

Brand names and logos are trademarks of their owners and are shown to identify the equipment we install and service. Chief Electric installs and services SPAN equipment. Chief Electric is an independent contractor and is not affiliated with these manufacturers.

The offer for this service

$500 Off
a 200A panel upgrade
Code CHIEF-PANEL500
Cannot be combined with other offers. 1 per household. Residential use only. Show at time of service.
Schedule Service

Panel and wiring questions

Does grounding protect against power surges?

Not alone. It's one part of the system, and surge protection needs a good ground to work.

Is grounding part of a panel upgrade?

Yes. Every panel we install leaves with grounding and bonding up to current code.

Do you charge for the quote?

No. An electrician looks at the job in person and quotes it, free.