Removal & Reinstall for a New Roof
Panels off before the roofer, back on after, with new flashing and a production check.
Signs your system needs help
- A new roof on the calendar
- A leak around a solar roof penetration
- Insurance is paying for a new roof
- An array that could be laid out better
How a service visit goes
- Record the layout, disconnect the array
- Take down panels and racking, store them safe
- Reinstall on new flashed mounts after the roof
- Restart it and check production
What moves the price
- Inverter, wiring, panels or monitoring
- Roof access and panel count
- Parts still under manufacturer warranty
- Remove and reinstall: array size, roofer's schedule
Permits for solar work
Repairs usually skip the permit. Inverter swaps, remove-and-reinstall and added equipment typically need one, and some changes go to your utility. Fees are on the quote.
Brands we service
Brand names and logos are trademarks of their owners and are shown to identify the equipment we install and service. Chief Electric installs and services Enphase, Tesla, Qcells Q.HOME, SolarEdge and SMA equipment. Chief Electric is an independent contractor and is not affiliated with these manufacturers.
Solar service questions
How long are solar panels off during a reroof?
Usually a few days to two weeks, however long the roofer needs.
Can you work around my roofer's schedule?
Yes. Two trips, both on the roofer's clock.
Do you charge for the visit?
Repairs start with a flat diagnostic fee, quoted when you book and waived on any repair over $500. Quotes for installs and upgrades are free.